@GANTT (Gantt Chart)

This macro creates a Gantt Chart with the specified parameters. A Gantt Chart is intended to show the status of tasks in a project between a scheduled start date and stop date or start date and duration.

SYNTAX:

@GANTT bTimeAxis bDurationMode bGroupCompress

PARAMETERS:

bTimeAxis; 1 = use time axis, 0 = do not use time axis

bDurationMode; 1 = Gantt data is Start, Duration, 0 = Gantt data is Start, Stop

bGroupCompress; 1 = use group labels to calculate the number of blocks per group entry, 0 = do not use group labels to calculate the number of blocks per group entry

EXAMPLE:

@GANTT 1 1 1

PERSISTENT:

YES

Next Macro Previous Macro Return to Alpha List

Next Macro in this Group Previous Macro in this Group Return to Group List